Home Build Index Next Page Previous Page
Plate work and Plumbing
The engine assembled so far with the regulator and steam pipework connected up for a trial run on air. I filled the boiler with compressed air through a clack valve and then had my first driving experience! (see the Video files page) The engine on the track!
The grate and ashpan part assembled. The bunkers and boiler fittings have been added. I was part way through the plumbing at this point.
Next Previous Index Home